This is an audio conversation from the CIO Talk Network podcast. The timestamps in the chapters and transcript below refer to the audio recording.
About this conversation
A CIO Talk Network conversation with Dan Mahlebashian (General Motors Corporation), Les Mara (Hewlett Packard), hosted by Sanjog Aul.
What the conversation established
The conversation established that multi-sourcing works only when the customer does the preparation itself. Dan Mahlebashian said General Motors standardized contract terms, statements of work, service level agreements, and pricing methodologies across its suppliers, and also standardized its own IT processes such as configuration management and incident management, before competitively bidding the work. He described a thin management layer over seven suppliers (six in IT plus telecommunications), each a single point of accountability, with a fixed price model that lets suppliers keep efficiency gains. Les Mara said the customer retains integration, governance, and accountability, and that Hewlett Packard runs a three tier engagement model covering daily delivery, service reviews, and executive sponsorship. Both said to define the what and let suppliers deliver the how, to keep clear lines of demarcation, to negotiate transition assistance before a contract is signed, and to reward good outcomes through approaches like gainshare rather than relying on penalties.
Host Sanjog Aul talks with Dan Mahlebashian, Chief Contracting Officer for Information Systems and Services at General Motors Corporation, and Les Mara, Head of Business Process Outsourcing for EMEA at Hewlett Packard, about keeping multiple competing IT vendors working together in a multi-sourcing arrangement. Mahlebashian describes how General Motors competitively bid its technology outsourcing to a group of Tier 1 suppliers only after standardizing contract terms, statements of work, service level agreements, pricing methodologies, and its own day-to-day IT processes, so work could move between suppliers. Mara argues that the customer keeps integration, governance, and accountability when it multi-sources, and that the most sustainable relationships use an adult peer group governance model with clear boundaries, dependencies, and incentives rather than only penalties. They discuss defining the what while letting suppliers decide the how, running governance across the whole supplier environment, assigning a lead integrator per scope of work, and transitioning work away from an underperforming vendor without disrupting the business.
Contributors
- Dan Mahlebashian, Chief Contracting Officer for Information Systems and Services, General Motors Corporation
- Les Mara, Head of Business Process Outsourcing for EMEA, Hewlett Packard
Host: Sanjog Aul, Founder and Host, CIO Talk Network
On this page: Key takeaways · Chapters · Explore more · Transcript
Key takeaways
- Dan Mahlebashian of General Motors Corporation says multi-sourcing depends on standardizing the contracts before the bidding starts. He said General Motors put standard contract terms, statements of work, service level agreements, and pricing methodologies in place with its Tier 1 suppliers first, and only then competitively bid on price.
- Les Mara of Hewlett Packard says the customer keeps integration, governance, and accountability when it chooses to multi-source. He said problems usually come from grayness or ambiguity around the intersections and dependencies between vendors, so the boundaries and who is upstream or downstream must be explicit.
- Dan Mahlebashian of General Motors Corporation says to define the what and let the supplier deliver the how. He said defining requirements too prescriptively eliminates innovation from the supply base, and handing off an undefined environment just gets you the same mess for less.
- Les Mara of Hewlett Packard says outsourcing is not only about cost reduction. He said the most sustainable relationships use an adult peer group governance model and reward good outcomes through approaches like gainshare rather than relying on penalties.
- Dan Mahlebashian of General Motors Corporation says a thin management layer works when every supplier operates on the same terms. He said General Motors runs seven suppliers as single points of accountability and can move development and hosting work between them because they share the same contracts and requirements.
- Les Mara of Hewlett Packard says conflicts are inevitable in a seven year outsourcing relationship and what matters is how they are handled. He said Hewlett Packard uses a three tier engagement model of daily delivery, monthly or quarterly service reviews, and executive sponsorship, and includes transition assistance so customers are not left stranded.
Chapters
- 0:00 Introduction: managing multiple IT vendors that must work together
- 2:20 Standardizing contracts across Tier 1 suppliers at GM
- 3:43 Keeping integration and accountability when multi-sourcing
- 5:48 Defining governance routines and lines of demarcation
- 9:35 Assessing whether an organization is multi-sourcing ready
- 17:06 Where innovation fits in a multi-sourcing deal
- 20:43 Peer governance, incentives and gainshare
- 25:18 A thin management layer with single accountability
- 28:08 A three-tier governance and escalation model
- 37:17 Designing for volatility and rewarding good performance
- 42:49 Transitioning work away from an underperforming vendor
- 52:13 The role of IT leadership in governing vendors
Explore more
- Should you marry your Technology Vendor?
- Handling the 5 Ps of Digital Transformation
- Handling Complex Events
- Handling Dark Data Perils
- IT Co-Sourcing: A new Promise
- IT Vendor Management: An Ongoing Challenge
Transcript
Introduction: managing multiple IT vendors that must work together 0:00
Sanjog Aul [00:00:20]:
Today’s topic is multi vendor Handling Uncomfortable Bedfellows. Our guests for today’s show are Dan Mahlebashian and Les Mara. Dan is the Chief Contracting Officer for Information Systems and Services, General Motors Corporation. And Les is the Head of Business Process Outsourcing for EMEA, Hewlett Packard. Good morning, pal. Welcome to the show. Good morning. So how is the New Year treating you guys?
Dan Mahlebashian [00:00:52]:
So far, so good here in Detroit, International Auto Show.
Sanjog Aul [00:00:58]:
Oh, yes, yes, that would keep you busy for sure. Yes, and how about you, Les? How is it going?
Les Mara [00:01:03]:
Yes, I think, well, we’re just back from a pretty long recess in Europe and I think it was quite a welcome recess. So we’re excited about the New Year and getting back into the corporate thrust of business day-to-day lives.
Sanjog Aul [00:01:22]:
Great. And now this topic in particular has become a very important one lately because we are now in the world of multi-sourcing because that looks like the only solution which will work when we want to get a lot done, but we don’t want to put all our eggs in one basket. We want to reduce risk and we also want to have a best of breed solutions approach to getting our job done by multiple vendors. With all that being said, it looks very good on paper and a lot of people have tried it, but a huge percentage is having a large issue with getting this all working in a smooth fashion. So there is an inherent complexity because you’ve got multiple vendors who may be competing against each other trying to make other people look not as good so that they can capture more market share. I mean, there could be so many things that could be preventing it from becoming successful. So what can we do so that it doesn’t look like an impossible task? Dan?
Standardizing contracts across Tier 1 suppliers at GM 2:20
Dan Mahlebashian [00:02:20]:
Yes. For me here at General Motors in the technology space, so this goes back to the resourcing effort that we went through 2 years ago where we competitively bid all of our technology outsourcing work to a group of Tier 1 suppliers for the most part suppliers that we had worked with historically. And in preparation for that, we saw 1 of the key enablers being the standardization of our contract terms, the standardization of our statements of work, service level agreements, pricing methodologies across all of our contracts, across all of the suppliers that we would be working with. So that we looked at that as a key enabler of being able to effectively execute in a multi supplier environment. So, we first put in place those standard contracts, if you will, working with that group of suppliers in the creation of those standard contracts. And then once that was in place, agreed to, we then started working on kind of competitively bidding from a pricing perspective. But the contract terms, the contract statement of work documentation was already behind us and agreed to by the suppliers.
Keeping integration and accountability when multi-sourcing 3:43
Les Mara [00:03:43]:
Yes, I guess where I would sort of answer the question, I think as a generalization, multi-sourcing, if it does focus on the best in class and managing risk holistically, it’s okay. But you have to be clear from a consumer or customer perspective about where the boundaries are and the logical rationale for those boundaries. And think of it as a supply chain with upstream, downstream dependencies and intersections that need to be managed and the integration of those needs to be managed and the escalations around those, if needed, need to be managed. And I think what many clients sometimes forget to do or forget to do to the degree needed is to remember that if they are multi-sourcing, they retain that integration, governance, accountability, responsibility. And it’s important for all parties that there is clarity of understanding around where those boundaries and intersections are and what the dependencies are that are implicitly created. And where it sometimes goes wrong is where there’s a grayness or an ambiguity around those intersections in my opinion.
Sanjog Aul [00:05:08]:
Now, Dan, you mentioned that you go in a certain way to plan your things and then bring everybody on board in terms of bidding on a given initiative and then see which particular group would be able to do the job best and then bring them in. Now that would work in one situation in one company and may not work in another situation in another company. And that is more like you can say workflow that you described. But many people would have tried the same workflow, but the quality or the things that they would have taken care of, which would make or break that whole workflow is the key here. That’s what people are struggling with. So do you have any pointers on that regard?
Defining governance routines and lines of demarcation 5:48
Dan Mahlebashian [00:05:48]:
Yes. And Les hit on it in properly defining the risk parameters, properly defining the governance routines and then strictly adhering to those governance routines as you execute the agreements. Part of what we did in standardizing the contract documentation was clearly define the linkages between one statement of work and another where they are related and the lines of demarcation between one segment versus another.
Sanjog Aul [00:06:43]:
So, Les, do you see anything which you see in when you come from a vendor standpoint, in some cases when a customer may be doing a job, but may not be doing as good a job for you to be able to work with your fellow vendor successfully?
Les Mara [00:07:01]:
Yes, I guess we’ll maybe come back to this 2 or 3 times during this conversation. But I think, and this is very much a personal view, but I think you have to start by having absolute clarity of outcome objectives or business goals or business context. And I think then if you engineer or construct and sustain the works and the governance around them, you’ll deliver those.
Dan Mahlebashian [00:07:33]:
coterminous objectives, which dovetail,
Les Mara [00:07:33]:
quite frankly, I think those goals are defined as sub-defined goals against each vendor contract. And therefore, you potentially get different vendors targeting and shooting off in slightly different directions commensurate with their subset goals and subset contracts. And at some point, you find that while you’ve optimized at a sub level, you’ve not optimized overall and then you end up with conflicts. So for me, I think it’s how you design top down an environment where everyone’s energy and focus and core competencies are focused on mutually agreed and consistent outcome objectives?
Dan Mahlebashian [00:08:48]:
Yes, Sanjog Aul, let me jump in here. I agree with those comments from Les completely. I think the key here is, but before you enter into this multi supplier environment, you need to clearly define your statement of work requirements, know exactly what it is you want, really define anticipated outcomes and then have standardization across the supply chain with respect to those requirements and the contracting terms that go along with it. So that your suppliers have the ability to work effectively together. If you using as an example, application sustainment, if you do that differently across the supply base, I think that’s where you’re going to run into problems.
Assessing whether an organization is multi-sourcing ready 9:35
Sanjog Aul [00:09:35]:
Now with that being said, what would you do as an organization, because you mentioned that it’s very important for us to be able to plan things in the best way possible. What would an organization do to do an self assessment and see if it’s multi sourcing ready before it takes on, because it’s a cost?
Dan Mahlebashian [00:09:53]:
Yes. For us, it was clearly defining not only those statement of work, service level, pricing methodology requirements, but we also went through a pretty exhaustive process of standardizing the processes that we use to operate our IT business. How do we do configuration management? How do we do incident management? And making sure that those day-to-day work processes were standardized and understood globally. With those two elements in place, the standardization of the day-to-day work processes along with standardization of the contract requirements and supplier environment.
Sanjog Aul [00:10:47]:
So, have you seen any place where when you go out and try to help an organization and they may think that they may have all standardized work processes, but then as a vendor you from an outside in standpoint see that this could be you can say improved before you would actually get into the multi sourcing environment? And this question for you Dan too that would you not allow a vendor to come and help you innovate further and stabilize even better before you would sourcing environment?
Les Mara [00:11:29]:
Yes. I was going to say, I think there’s probably 2 questions there. I think in terms of assessing if it’s right for a customer to go multi-source or single-source. I think I would always start with what problem are you trying to solve and what risk are you trying to mitigate. And as a generalization, I’m anti complexity and I’m very pro simplification and standardization and clear lines with responsibility, accountability in terms of fulfillment and so on. So I think you shouldn’t dismiss single-source, but I think you should look at specific situations and say, okay, what’s the pros and cons here of multi-sourcing? The con is I, as a customer, retain integration and more accountability through outcomes and governance and risk. The pro is I’m spreading my risk and I’m buying core competencies from the composite market. And I wouldn’t say one size fits all. I think you have to look at different clients and the dimensions of the challenge and the reason clients are going through the transaction. Outsourcing is not all about cost reduction. Sometimes it’s changing the paradigm. Sometimes it’s simply an acknowledgment of the core competencies because world-class enabling services, whether they are business process back office or their BPO, are not available. So I think that would be the way I would answer the question.
Dan Mahlebashian [00:13:16]:
Yes, agreed. I think a couple of follow on comments. We want to make sure that we’re being clear. When we define our requirements and standardize, we don’t want to do it in such a prescriptive fashion that we eliminate innovation from our supply base. We want to focus on defining the what and then let the supplier present to us and execute the how. And then the other trap that we wanted to avoid is simply handing off an undefined environment to a supplier, you then kind of fall into the trap of simply getting the same mess for less. You’ve got the same problems on your hand, you’ve just shifted responsibility and perhaps you get a little better price, but you really don’t transform things.
Where innovation fits in a multi-sourcing deal 17:06
Sanjog Aul [00:17:06]:
Before the break, we spoke about innovation, which is now supposed to be a crucial component for any successful multi-sourcing engagement that you would go with. Now where exactly are we innovating here? One other thing that was discussed just before the break is that we can have the vendors, we told what we want and they tell us the how. Now can we elaborate on that a little further?
Dan Mahlebashian [00:17:52]:
Yes, let me start. As I mentioned just before the break, you don’t want to fall into the trap of being too prescriptive in how you define your statements of work. You are outsourcing this work for a reason. You want the supplier’s expertise, you want their experience and their ability to innovate and transform the environment. So if you’re just too prescriptive in how you define the obligations, the requirements of the agreement, then you can really not stimulate that. You’ll be constrained, if you will. So we took the approach of defining what it was we wanted using application sustainment activities as an example. We defined what requirements, what acceptance criteria, what outcomes we wanted, but we really left it up to the supplier to establish the environment, establish the methodologies that then deliver the services. And the other thing we did is in our pricing methodologies, because we use a fixed price approach that allows the supplier to be more efficient. If they do have efficiency gains, they enjoy that, we also see that as we bring new applications into that environment in terms of they’ve freed up resources, they’ve consolidated activities and then we benefit from that.
Sanjog Aul [00:19:38]:
So in a way, it starts to be incentivizing them that you’ll get more business if you help me, say, more. I’ll put it right back.
Dan Mahlebashian [00:19:43]:
Yes. For us, it’s all about globalizing the business, developing global applications and reducing our legacy applications that may be business unit or regionally focused.
Sanjog Aul [00:19:57]:
Les, before you go ahead with your comments, I had a question. Usually outsourcing is supposed to be a means to an end. As you said, your goal is to make your business global and then this is coming where you are trying to use this multi-sourcing environment to reach that end. Vendor, on the other hand, may have a tendency to say one in the hand is better than two in the bush and may not be willing to go that route where he’ll say, okay, we will get lots of business in future, so let’s try to invest that much from our side, which may not give us immediate ROI. Is that the mindset that you see or am I going the wrong direction here?
Peer governance, incentives and gainshare 20:43
Les Mara [00:20:43]:
No, again, I can’t talk to industry in general or indeed, Hewlett Packard, I really in a sense, but my perspectives on the question are that generally speaking, the services that get delivered are delivered in the context of what the customer has defined by way of the what and depending upon the level of prescription in that definition, relationships, the most sustainable outsourcing relationships are where there is a fairly adult peer group governance engagement model in place where both customer and supplier come to the discussions in terms of trying to assess collectively and collaboratively how to get to a better place. And I also don’t think outsourcing is purely about cost reduction. I think it’s about how you create and drive additional incremental value or competitiveness in the businesses that are being served. And additionally, I think innovation needs to be targeted. We’re talking HP about technology for better business outcomes and so on. And I think you have to know what you’re targeting in order to define an innovation program. And I think it’s important also to recognize innovation doesn’t come for free, that’s not just dollars, it takes time, it takes effort. You have to always think about what the solution design is to look like, how and when you deploy it and what the engineering implications of that are and what any retrospective activity is required to keep the overall operating environment whole, whether that’s the application layer or the infrastructure layer or even the support and the business process layer. And I think for me, where I like to go with my client relationships is to get the focus on what do we want to do next year, what does it take to get there, how do we do that collaboratively and jointly, including maybe third parties if it’s a multi-sourcing environment. And if there’s a business case that resonates as a result of that, how do we share the benefit of that business case? And some parts of the industry talk about things like gainshare and so on. And I think those sort of commercial vehicles increasingly encourage the right behaviors and lead to collaborative innovation.
Dan Mahlebashian [00:23:29]:
Sanjog, let me add a couple of comments to the good comments that Les just gave us. When we talk about governance, it’s important that we understand it’s not only governance with respect to a specific supplier agreement or a specific supplier, it’s governance around the entire environment. So in our contracts, we’ve defined governance models that speak to both the specific contract, the relationship with that particular supplier, but also the entire supplier environment. So we have governance activities, whether it’s a meeting or collaboration efforts supplier environment, it’s on a regular routine basis getting that entire supply chain together and talking through capacity planning, talking through innovation efforts, so that you all see the activities that are influencing each of you?
Sanjog Aul [00:24:40]:
So among multiple vendors and since these are nothing else but bunch of people, of course, group under different company umbrellas, but at the end of the day, they are all people. And would you from a customer standpoint, Dan, treat them as black boxes who are interacting and you control the interfaces or would you reach out within an organization and make sure that those people have the right intent and the right approach to deal with one another and in fact come to the not exactly micromanagement level, but to some extent at that level where you’re even helping manage conflict, so that you are the one who’s going to gain or lose because of that?
A thin management layer with single accountability 25:18
Dan Mahlebashian [00:25:18]:
Yes. We took a fairly thin layer of management approach in structuring the agreements and we have 6 primary suppliers that we work with, with our IT services, 7 suppliers that we work with our IT services, 7 if you count telecommunications and that’s it. They have all the Tier two agreements, they have all the subcontracting agreements, that group of seven suppliers are single point of accountability with respect to all the technology outsourcing that we do and we are completely outsourced in our environment. We then define in our contracts certain rules around Tier two suppliers that they can introduce into the environment. We have sign off authority, but we really leave this up to our suppliers to manage again we define what it is we want them to do, they define how and then they go out and execute. Now we have contract managers assigned to each of these agreements, relationship managers assigned to each of the suppliers that all working together in a governance model, well integrated governance model we’ve managed through this.
Sanjog Aul [00:26:33]:
So how would you at all since you said that you’re keeping a very thin layer of management, if there are conflicts and which are very obvious and they are hurting us, how would you manage them?
Dan Mahlebashian [00:26:46]:
For us, it’s just sitting down and working through the problem, making sure that we properly define the problem, making sure that we documented the issues that we’re facing, making sure that we both understand the problem, making sure we’ve clearly articulated it and then we’re just working together in a good relationship fashion, a solution that works for both of us and you’re not always going to get there, but oftentimes we are able to work through the problems knowing that there is additional business on the table knowing that there are gives and takes in this long term relationship?
Sanjog Aul [00:27:36]:
So, Les, like Dan, looks like he has, of course, his organization under his leadership has his act together from a multi sourcing environment and he’s able to, along with his team, manage such conflicts and the different interrelationship related issues. What different flavors of conflicts that you could see would be happening, I mean, not directly with HP, but given that you’re in that space, which needs to be managed and do you think all customers thinks like what General Motors thinks?
A three-tier governance and escalation model 28:08
Les Mara [00:28:08]:
I think the environment Dan described shows the level of maturity and experience that you would expect from GM and I think GM is a good role model in many ways for others to look at and take note of. In Hewlett Packard in general, we’re guessing no different than 12 vendors. We tend to operate kind of a 3-tier governance engagement model. Obviously, the lowest level is focused on the day-to-day delivery to commitments, delivery to expectations and delivery to the SLAs. And operationally, we control that in all the normal ways. Typically, there will be level 2 with the escalation of doing service management reviews on a monthly or quarterly basis. And the level above that is an executive engagement sponsorship level, which is directionally to make sure we continue to be aligned with the long term strategic aims of our customer and the long term strategic intent of the contracts we have. And by having those 3 levels of engagement, you have naturally 3 levels of perspective on both sides of you as of of defense and therefore, ways of resolving, conflicts and issues when that when they occur. And let’s be factual about this.
Les Mara [00:29:38]:
always get conflicts and issues in a 7-year relationship with services delivered in an outsourcing environment, and I think it’s how you deal with those that’s safe and mutually solvent. That’s crucial.
Sanjog Aul [00:33:33]:
We always know that there could be a situation that in an outsourcing function is being handled by more than one vendors. And since we do not we may not have a clear line of demarcation of responsibilities, that’s where the accountability issue would come up and we would have a tough time determining where to give have penalties or incentives imposed for non compliance or performance. And this could be very true for large organization where one business function or outsourcing function is large enough that it warrants that more than one vendor takes care of it just for the sake of redundancy, if nothing else? Dan?
Dan Mahlebashian [00:34:31]:
Yes. I’m going to go back to my earlier comments at the start of this discussion. One of the indicators of you are being ready to go into a multi sourcing environment is make sure that you do have clear lines of demarcation from one segment to another, one scope of work to another, where we’ve seen in this evolution of outsourcing here at General Motors, the relationships breakdown is where you do not have that. So one of the things that we clearly did that we think is working to the success of these agreements in this environment is again defining clearly the requirements and start and end around this and even going so far as defining the detailed calculations that go into the service levels and the measurement tools that we’ll use to arrive at those service level calculations. If you leave all that to after the contract have could be avoided by having it done upfront.
Sanjog Aul [00:36:00]:
But don’t you think in a dynamic situation, because right now we are not having a status quo for like 2 years every month. There are more things happening within an organization, you want to evolve, you want to grow and whatever expectations you may have set in the beginning, the very scope could change and we will just be playing catch up and or don’t we play catch up right now?
Dan Mahlebashian [00:36:22]:
Yes, that could be. We’ve defined pretty thoroughly our work segments and we don’t stray from that. We’ve got a very tight governance routine that we ask our suppliers to help administer, so that I’m not taking workscope from one segment and assigning it to another mid flight in these contracts.
Sanjog Aul [00:36:48]:
And what are the typical things Les that you see where like Dan is saying that he’s got the controls in place so that even there is change management has to be introduced because of the very dynamic nature of the business today. They are able to make sure that the accountability is very crystal clear and demarcation is very, very visible. What do you see when you go out and you’re working with your fellow vendors and suddenly there is a change? Is that always possible or is it more theory?
Designing for volatility and rewarding good performance 37:17
Les Mara [00:37:17]:
I think to echo, Joe, the point you made, I mean, we live in an increasingly volatile, agile world where nobody has too much patience for delays in dealing with change of requirements. So building flexibility and responsiveness into service delivery models and into governance constructs and change management will be for future outsourcing deals. And certainly, I would advise the clients who are continuing outsourcing today think about how they’re going to deal with volatility and how they’re going to be able to provide more agile, more responsive solutions to their internal customers or indeed the markets they serve and how they engineer that with their service providers would be for one or two in terms of multi-sourcing environment. And again, I think it’s important to be clear, where the handoffs are, where the boundaries are of responsibility and where the dependencies or interdependencies are and who is upstream or downstream from whom in the end to end. And the more that’s minimized, I think, is a generalization, the better. Things that get in the way, things that get in the way of vendors collaborating and dealing with change in responsiveness, commercial terms for sure, the rigidity of the processes that the customer has defined or defined through third party sourcing advisers, sometimes look good on paper, sometimes don’t work in a sustainable sense long term. Intellectual capital or proprietary elements of what the service centers are bringing to the table. One of the reasons for outsourcing, which Dan touched on is you’re buying into the investments that people like PacoGuardian and others are making strategically, but nonetheless that can package them their competitive advantage and it’s difficult to share that sometimes. You know, egos and the grayness around who is prime or who is sub or how does the collaboration between vendors work. And finally, I think, you know, lots of the time in a contracting process because the nervousness around outsourcing, a lot of emphasis goes into risk mitigation and protecting downside and, you know, the penalty type of agent of what happens if it goes wrong. I would certainly like to encourage all of us to think more about how we incentivize for things going well, you know, and get more focus on a more positive orientation to all carrot rather than stick, which I think will encourage the right behaviors and encourage people to go the extra mile to mention with mutually agreed business outcomes.
Sanjog Aul [00:40:48]:
How do we handle a break in the equilibrium that is already established where we have a stable ground and then you and your crew has done a phenomenal job in bringing everybody on the same page? Guess what? Now one of the vendors starts performing not up to the expectation. So you have to yank them out and of that nature, but business still has to go on at the same time. How do you handle this?
Dan Mahlebashian [00:41:21]:
Yes. As I mentioned earlier, a key for us was having standardization across the supply chain in our They’re all operating under the same contracting terms. They’re all operating under the same statements of work and service level provisions, pricing methodologies and that’s I can’t underscore enough how important that is and in this multi supplier environment. I do have the ability to move work around. I competitively bid development projects all the time and swap those out amongst our suppliers. They have the ability to move the hosting services from one supplier to another. I do that relatively seamlessly because they are operating with the same sets of requirements and same contracting terms.
Sanjog Aul [00:42:25]:
And you think that when you must have done this already, so you’re telling based on your experience that if there is a poorly performing vendor, to transition them out, you would not just pull the plug on them one fine day, right? You would have to do something, which is the knowledge has to be transitioned to someone else and you get all the support and everything just because you have a strong SLA in place?
Transitioning work away from an underperforming vendor 42:49
Dan Mahlebashian [00:42:49]:
Yes. And we want these we want our suppliers to succeed. I mean, if they’re successful, if they’re healthy, then we’re going to enjoy the benefits of that. But in the event something does happen where we have to transition away from a supplier, one of the key terms that you want to have in place is as you negotiate upfront and get this done in the contract before it’s signed are transition assistance services where if you do reach an unfortunate point where you have to part ways that incumbent supplier has an obligation contractually to assist you in transitioning work to a new supplier.
Sanjog Aul [00:43:32]:
And Les, I don’t know if you would ever be in a situation where you are taking over or work has been taken away from you. What is your reaction to that?
Les Mara [00:43:46]:
I think, outsourcing agreements typically are contracted for 5, 7, 10 years, sometimes longer. And as I said, in the world we live in these days, it’s very unusual to find any environment stable for that long and contracts do get terminated for convenience for different reasons. And I think, as Dan says, I think all of the Tier 1 vendors, I think, including Hewlett Packard, now have pretty robust processes in place to ensure that customers are not less stranded in the unfortunate event of service delinquency and we’ve been to transition in a recovery center, which we’ve been to transition out without that disruption. Sorry, and I was just to build on your earlier question in terms of things going wrong. Normally, it’s not and I’m sure there are exceptions to this, but normally it’s not through just incompetency. There are certain cause and effect dynamics, which lead to situations going wrong. And as a generalization again, and I think what Dan is saying about spending the word specification and so on, it’s normally because things have not been well thought through the design trade or expectations have been set where maybe the time or the budget to achieve the transformational aspects are not robust or not whole. And I think it’s very I think it’s really rare for it to be purely down to incompetency in this day and age. I think most of the supply side industry, they’re proud of its reputation, wants to respect, wants to protect its reputation and generally speaking, wants to do a good job.
Sanjog Aul [00:46:06]:
One question we always saw, in fact, there’s one strategy that has been suggested, where you are expecting one of the outsourcing vendors to take a leadership role so that we have one point of contact and let them deal with their issues internally as a vendor community and let customer just be dealing with one point of contact. Do you think Dan or Les this approach would help or would work against the very sanity of both parties involved?
Dan Mahlebashian [00:46:41]:
From our perspective, we have assigned lead suppliers for particular work segments and then all contracting from that supplier for that scope of work is managed by that lead integrator. Now that the Tier two suppliers, if you will, maybe other suppliers in our supply chain of the big seven, there may be other suppliers outside of that group of seven, but we’ve clearly taken the approach, if we’re going to commonize and globalize this business and really leverage our global footprint, having consistency and commonality across the enterprise globally with one point of accountability for specific scopes of work is very key to our success. I don’t want to have to have two or three suppliers that I have to deal with in manufacturing and quality systems or product development systems. It’s very important to us that we’re going to leverage our global footprint that we do things in a global consistent common fashion and one primary integrator per work scope works well for us.
Sanjog Aul [00:48:01]:
Les, if you were in a leadership shows where you were asked by the customer to take on leadership, I mean, for your organization, would you want to deal with the extra pain that comes along with managing other vendors or kind of taking accountability for their action?
Les Mara [00:48:19]:
I think I mean, I guess, I’m repeating many ways what’s going on. So I think it depends on the situation. If and in some ways, I’m answering the question, I guess, I would say what’s important is in any hierarchy of customer supplier using the generic meaning of those terms, it’s important that you know who you’re taking your instructions from, who your consumers are of your service, who your legal contract is and what level of risk, empowerments and accountability you have to fulfill and that you have, you know, quite control of your own destiny in that sense. So, if a client is asking me to take responsibility as a prime contractor and I’m dependent upon other subcontractors to deliver that. What’s important to me is to understand whether those subcontractors are imposed upon me or whether I’m controlling them and to what degree I’m confident that they’ve got the capability to not to leave me exposed clients. And, you know, I don’t think there’s a general, good bad answer to the question. I think you have to look at economically.
Dan Mahlebashian [00:50:05]:
And a couple of quick follow on comments. One, you don’t want, we talked earlier about innovation and if we as a customer are inserting ourselves too often into the management of the services underneath these contracts and then we could find ourselves in a position of stifling the suppliers ability to innovate, which is why we outsource to them to begin with. At the same time, we have found that the more you insert yourself into these contracts and into managing the services underneath these agreements, you create opportunities for that primary supplier to raise their hand and say, I wasn’t able to fulfill my obligation because you did something, because you’ve suddenly taken a leadership position versus you gave me the contract, situation, the more excuses you’re creating for that primary supplier to say, I’m no longer responsible, I’m no longer accountable.
Sanjog Aul [00:51:24]:
Les, did you have something that you wanted to say?
Sanjog Aul [00:51:28]:
Now one final question I’d like to ask is that since we’re talking about relatively IT and this is an IT related show while we can take care of the BPO side as well. But mostly from an IT standpoint, IT leadership also wants to control in some form or fashion how things are done. And there’s always been multiple views about different schools of thoughts about how much of IT leadership involvement should be there in handling these vendors besides just telling them what to do? How would you see IT leadership getting involved and should they just kind of stay away and just kind of tell you what and then just make see the action happen?
The role of IT leadership in governing vendors 52:13
Dan Mahlebashian [00:52:13]:
Well, I can talk about what works well for us. IT has taken a leadership role in establishing and governing these contracts. We have my function is an IT function. We our customers are the information officers that are running the technology side of the business. It’s critical to us to have the IT folks, the technologists not only defining requirements on the front end, but also owning delivery of the services underneath these contracts and operating the services underneath these contracts on a day to day basis. We don’t leave this up to a general procurement organization. These are specialized services that we want our technology leaders day to day integrated in with the suppliers.
Les Mara [00:53:16]:
IT service delivery is an integral part of day to day life. We take for granted what we do, heating, electricity and any other utility these days. And I think when you outsource, you have to consider how you ensure continuity and business integrity. And I think in terms of setting direction and strategy, and as Dan said a couple of times, owning the what, I think the client has to retain those accountabilities in the sports business. I think the client can abdicate from that in terms of what it is that is needed to continue to ensure the integrity of the business and business delivery. Increasingly, large customers are assigning those sort of responsibilities to shared services based functions. So the business units, let’s say, don’t have the overhead of worrying about enabling functions, technology, infrastructure capabilities. And increasingly, those shared services functions are outsourcing the execution and delivery in terms of the how to the supply side. And I think that’s the general sort of operating model trend that we and others are seeing and experiencing and delivering against. But I think the client has to retain the responsibility even if it’s collaborative and it’s worked in association with supply side partners, the responsibility of defining the strategy and the directional stuff and ensuring the end to end integrity of that.
Sanjog Aul [00:54:59]:
On behalf of the show, I’d like to thank you, Dan and Les, for sharing your thoughts about how in a multi vendor sourcing environment, we can really have these vendors work together and let the customer win in this whole process. And of course, this is also a win for all of them.
Sanjog Aul [00:55:26]:
Now multi sourcing seems to be bringing out the best among the vendors and also is promising the maximum ROI from outsourcing. However, to reach a stable state where all vendors are working as partners and as a happy family and bringing the best value to their customer, there have been some challenges and primarily because either the things were not planned well and or the SLAs and other people management issues were not handled well. We, of course, we have to plan things very well for this to work.


